My Pool Removal.com

Home / Costs by city / Bakersfield

Pool removal in Bakersfield, California

Kern County, on PG&E. This page covers the permit you will need and what the pool costs you every year it stays. It does not price the removal, because only the contractor who walks the yard can.

Work out which removal you need

Bakersfield at a glance

CountyKern County
Serving utilityPG&E
Electricity rate$0.40 per kWh
Water rate$8.90 per 1,000 gallons
Evaporation loss16,000 gallons a year
Demolition permitRequired
Cost to keep it, year one$4,013

What it costs to keep it

What keeping the pool costs in Bakersfield

What the pool costs in Bakersfield · year one

Water lost to evaporationrising 5.5% a year$142
Chemicalsrising 3% a year$680
Pump electricityrising 5.5% a year$600
Weekly service, labourrising 3% a year$1,680
Repairs and equipment, amortisedrising 3% a year$801
Insurance differencerising 3% a year$110
Year one$4,013

Next 5 years, if it stays

$21,507

$4,013 in the first year and $21,507 over five. Each line rises at the rate its own cost driver has published, 3.5% a year across the ledger. Heating is not in this figure, so treat it as a floor. What removal costs is a separate question, and only a site visit answers it.

PG&E electricity at $0.40/kWh, water at $8.90 per 1,000 gallons, 16,000 gallons a year lost to evaporation. Escalation from CPUC and local agency rate filings read September 2026.

Permits

What Bakersfield requires

A pool is a structure, so taking one out is a demolition. That means a permit, and it means inspections while the hole is still open. An unpermitted fill shows up at resale, and an appraiser who cannot find the paperwork treats the yard as a liability.

We have not read Bakersfield’s own handout yet. What follows is what every California jurisdiction requires. Call Bakersfield’s building department before you file, and treat their answer as the authority rather than this page.

Demolition permitRequired, no exceptions
Open-hole inspectionRequired before any fill
Engineered fillRequired for partial and complete
Compaction reportRequired at close-out

What California requires statewide, and how partial and complete removals differ

What to expect

Four stages, two to five days

  1. 01

    Permit and utility locate

    Filed with the Bakersfield building department. Gas and irrigation lines are marked before anything opens.

  2. 02

    Drain and demolition

    The pool is drained to a sewer clean-out, then the shell is broken up and the decking cut out.

  3. 03

    Fill in lifts

    Engineered fill goes in in layers, each one compacted and tested rather than dumped.

  4. 04

    Compaction report and close-out

    The report is what you hand a buyer. Without it the removal is invisible on paper.

Nearby

Other cities in this area

All 29 California cities →

Work out which removal you need before anyone quotes you.

Six questions about the pool, the access and what you want the yard to become. It names the option, lists the scope, and does not put a price on it.

Show me my options